Skip Ribbon Commands
Skip to main content

MPHL :
New Lab Building Phase 1: 2012-07-13 Backfill under the loading dock

Name

2012-07-13 Backfill under the loading dock

Preview

Workers erecting concrete forms for the lower level north wall.  Excavator backfilling with stone in preparation for the underground fuel tanks (near the loading dock).

Title

July 13, 2012

File Type

jpg

Picture Size

2144 x 1424

Date Picture Taken

7/13/2012 10:17 AM

Description

Workers erecting concrete forms for the lower level north wall.  Excavator backfilling with stone in preparation for the underground fuel tanks (near the loading dock).

Keywords

 

Document ID

JHQQSZKKEHZ5-6-32

Target Audiences

No targeting
Created at 3/12/2013 6:58 AM by System Account
Last modified at 3/12/2013 6:58 AM by System Account