Skip Ribbon Commands
Skip to main content

MPHL :
New Lab Building Phase 1: 2012-07-05 First Concrete Floor Pour (mudmat)

Name

2012-07-05 First Concrete Floor Pour (mudmat)

Preview

Workers beginning to pour the mud-mat floor for the electrical room.

Title

July 5, 2012

File Type

jpg

Picture Size

1936 x 1296

Date Picture Taken

7/5/2012 12:16 PM

Description

Workers beginning to pour the mud-mat floor for the electrical room.

Keywords

 

Document ID

JHQQSZKKEHZ5-6-29

Target Audiences

No targeting
Created at 3/12/2013 6:58 AM by System Account
Last modified at 3/12/2013 6:58 AM by System Account