Skip Ribbon Commands
Skip to main content

Name

2012-05-01

Preview

View: Looking at the east side of the structure
De-watering continues in the elevator and sump pits as the footings, walls and columns poured.

Title

May 1, 2012

File Type

jpg

Picture Size

2144 x 1424

Date Picture Taken

5/1/2012 12:40 PM

Description

View: Looking at the east side of the structure
De-watering continues in the elevator and sump pits as the footings, walls and columns poured.

Keywords

 

Document ID

JHQQSZKKEHZ5-6-23

Target Audiences

No targeting
Created at 3/12/2013 6:58 AM by System Account
Last modified at 3/12/2013 6:58 AM by System Account